Client
Abu Dhabi Airports Company
Location
Zayed International Airport
Date
2023
Full refurbishment of Level 2 short term carpark, with safety enhancements to Level 1 and Level 0.
Civil & Architectural Works
- Surface grinding to remove the existing painting and line marking
- Crack and joint repairs to existing car park slab
- Leveling of existing slab where required
- Surface preparation of the existing slab to receive the new paint
- Painting of car park spaces, numbering, line marking and wayfinding signage
- Supply and installation of traffic calming measures to all car park levels